Guild line for pre start-up air-cool chiller


Before Trane service authority technician proceed the start-up for chiller, HVAC system need to be ready for chiller operation

The following items are needed to be installed or completed before Trane Service Technician proceed the start-up for equipment:
  • Unit in place.
  • Water piping connected and plushing.
  • Flow balancing.
  • Wiring to starter panel.
  • Pressure gauges, Thermometers, thermometer wells and Air vents.
  • Load condition.